RWS(Rural Water Supply)
Departmental Activities:
Rural Water Supply and Sanitation Department is the nodal agency in the State for providing drinking water and sanitation facilities in rural areas. The drinking water facilities are being provided by various types of schemes such as bore wells with hand pumps/single phase motors, direct pumping schemes, MPWS Schemes, PWS Schemes and CPWS Schemes.
No of PWS Schemes |
413 |
No of MPWS Schemes |
19 |
No of CPWS Schemes |
39 |
No of Hand pumps |
317 |
Brief notes on State Govt. schemes implemented:
Jal Jeevan Mission (50% State Share and 50% Central Share)
NABARD (10% State Share and 90% NABARD Share)
PMAGY
PMAY (Jagananna Colonies)
15th Finance
CMDF
Scheme-wise Progress (along with target and achievements)of the above schemes:
At present the following spill over works are taken up during the year 2021-22.
Under JJM Grant, 1053 works with an estimated cost of Rs.27736.82 Lakhs for Retrofitting, out of which 280 works were completed, 396 works are in progress and 377 works are to be started. 229 works with an estimated cost of Rs.5598.11 Lakhs for Augmentation, the works are in tender stage.
Under NABARD Grant,1 spill over work wastaken up and completed with an estimated cost of Rs.250.00 Lakhs for providing drinking water to 5 Habitations.
Under PMAGY Grant, 42 works with an estimated cost of Rs.369.20 Lakhs, out of which 14 works were completed, 14 works are in progress and remaining 14 works are to be started.
Under PMAY Grant, 318 Layouts water supply for construction purpose of Jagananna Colonies (PeedalandarikiIllu) works sanctioned with an estimated cost of Rs.1258.12 Lakhs, out of which 249 Layout works completed, 43 Layout works are in progress and 26 Layout works are to be started after completion of site leveling.
Under 15th Finance Grant,the works of Operation and Maintenance of 35 Nos. of CPWS Schemes taken up with an estimated cost of Rs.3465.00 Lakhs and the works are in progress.
Under CMDF Grant,106spill over works are taken upwith an estimated cost of Rs.573.50 Lakhs, out of which95 works were completed 4 Works are in progress, 2 Works are to be started and 5 works were cancelled due to covered under other grants.
Contact details (mobile, e-mail)
Dy Executive Engineer, RWS & S Sub Division, Amalapuram,
Contact No.9100121112, Email : deerwsamp[at]gmail[dot]com
Success story of the department , along with photos :
CPWS Scheme to Gudimellaka and other habitations of Malkipuram and part of Sakhinetipallimandals:
The CPWS Scheme to Gudimellaka and other habitations of Malkipuram and part of Sakhinetipallimandals was commissioned in the year 2000. The scheme was proposed to cater the needs of people of 98 habitations of Malkipuram andSakhinetipallimandals. The scheme was designed for 1,27,700population to supply 40lpcd. The source of the scheme was Godavari surface water fed through Gannavaram canal from Dowleswaram barrage to the SS Tank. The Malikipuram and Sakhinetipallimandals are located at the tail end of Gannavaram canal and most of the habitations are coastal habitations. 5nos of Slow sand filters with treatment capacity of 5MLD (1MLD for each filter) were provided for raw water treatment in the execution of the scheme.
Due to high turbidity, in the range of 100 to 250 NTU of raw water from P.Gannavaram canal during rainy season from June to October, SS filters are being clogged very frequently and hence it is becoming necessary scrapping of top settled skumtzdeck duly sending out all the water and drying up the SS Filter, once in a week. Thus, in every week two filters beds are under such process and hence the required water is not being filtered. As such, the water is not being supplied to public at 40 lpcd. It is being supplied at 25-30 lpcd.
To overcome the problem, as an interim measure, 5MLD Micro Filter (3MLD Micro Filter is installed in the year 2010 and another 2MLD Micro Filter is installed recently) is provided to CPWS Scheme Gudimellanka and thus the required quantity of treated water is being produced and thus water is being supplied to public at 40 LPCD.
The Village Satyanarayanapuram H/O Atchutapuram is a village in KapileswarapuramMandal in Mandapeta constituency is declared as HarGharJal Village.
Sub Divisional Level Lab – 1 @ Amalapuram
Drinking water project in coastal Area:
Drinking water project in coastal areas sanctioned with an estimate cost of Rs.1650.00 Lakhs to cover the eastern delta 16 mandal and central delta 16 mandals with Godavari water as source at Dowleswaram.
Central Delta trunk – Rs 434.18 cr
Eastern Delta trunk – Rs 391.43 cr
24 mandals with 1400 habitations to be covered with an estimate cost of Rs 331.63 cr under this project.
Specific GOs / Court orders / Acts/Policies of the department:
GO MS NO-2290 – O & M Protocol
Ms. No. 195 – Entrustment procedure for PR and RWS
O.MS.NO.8 – Entrustment and Contract Management of works Execution
JalJeevan Mission guidelines
O.MS.No.234, Dt.11-12-2018 of PR & RD, (RWS&S-I) – Powers of technical sanction and entrustment of works